by Garry Kemp | Sep 20, 2012
This East Yorkshire Farmhouse was extensively extended using reclaimed materials. The project included a 12m x 7m Orangery extension, and a two storey Bedroom and study extension. The garden was also landscaped with a large sandstone terraced patio. Three...
by Garry Kemp | Jun 11, 2012
Phase 2 of a new retail development has recently been completed at Newbegin, Hornsea. The project required the demolition of a row of existing shops built in the 1960s. A new heavily reinforced raft foundation was constructed to address problems with poor ground...
by Garry Kemp | Sep 20, 2012
. This extensive refurbishment of an existing house in Skirlaugh, East Yorkshire included the addition of two large extensions – kitchen and garden room. The refurbishment comprised a new heating system, re-roofing, Sto self cleaning render, new windows &...
by Garry Kemp | Sep 20, 2012
This extension to a swimming pool at a private house in Beverley was a challenging build – the gardens were extensively landscaped and access to the work area was severely limited. All building materials had to be brought in by hand and careful planning was...
by Garry Kemp | Sep 20, 2012
This modern Oak Framed garden room extension was created as a “problem solver” – the extension had to fit below an existing wall and...