by Garry Kemp | Feb 13, 2017
Kemp Developments were pleased to be selected to construct these new offices near Brandesburton: They comprise of two storey offices with a portal steel frame. The exterior is built from Forticrete polished concrete blocks and aluminium curtain walling. The rear...
by Garry Kemp | Apr 30, 2015
Kemp Developments Ltd undertook the construction of a new Visitor Centre for the RSPB at their Bempton Cliffs Seabird reserve. The project included the partial demolition and remodeling of an existing building and two new extensions to substantially increase the...
by Garry Kemp | Oct 10, 2013
This disused factory unit in Leven, East Yorkshire, was remodelled and converted into modern office suites by Kemp Developments Ltd.
by Garry Kemp | Feb 25, 2013
This New Extension at a Convent in Hull was constructed to house a...
by Garry Kemp | Jan 19, 2013
This new commercial entrance porch in powder coated aluminium was constructed at a Hull office building, the new DDA (disability) ramp includes stainless steel handrails with concealed lighting in the handrail.
by Garry Kemp | Sep 25, 2012
Kemp Developments were selected to under take lottery funded repairs and refurbishments to Hornsea Museum – including roofing works, masonry repairs, strengthening floors, insulation to the roof and replacement Yorkshire sliding sash windows. Refurbisheded in...